if.team

if.team

Workloads

How to quickly edit the total time of a task

  1. Go to the tab “Tasks” → “Workloads”.
  2. Locate the task and the day for which you need to modify the total execution time. If required, utilize the filter, search, and suggested switches.
  3. Implement changes in the field, with the maximum value set at 23 hours and 59 minutes 1️⃣.
  4. Click on the marker at the top of the column 2️⃣.
  1. In the new window, confirm the changes by pressing the “Save” button.